Department of Civil Engineering, CPUH

Department of Civil Engineering, CPUH Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Department of Civil Engineering, CPUH, College & University, Bhoranj (Tikker – Kharwarian), [H. P], Hamirpur.

28/10/2025

Campus Placement Drive | Alkem Labs
Career Point University proudly announces a Campus Placement Drive for Alkem Labs, offering the position of Business Development Executive for MBA (HR) students of 2025 batch.
💼 Salary: ₹3.5–4 LPA (Including Variables)
📍 Location: Baddi, Himachal Pradesh
🚀 Joining: Immediate
An excellent opportunity for aspiring professionals to begin their corporate journey with one of India’s leading pharmaceutical companies!

28/10/2025

Campus Placement Drive | Capgemini Pvt. Ltd.
Career Point University is delighted to host a Campus Placement Drive for Capgemini Pvt. Ltd. for 2025 pass-out graduates across all streams.
💼 Salary: ₹15 LPA
📍 Location: Bangalore
An exciting chance for our talented students to kickstart their careers with one of the world’s top IT and consulting firms!

Demonstration of AutoCAD
26/04/2025

Demonstration of AutoCAD

09/04/2025
The In-Situ Slump Test is a field test used to determine the workability of freshly mixed concrete. Here's an overview:*...
19/03/2025

The In-Situ Slump Test is a field test used to determine the workability of freshly mixed concrete. Here's an overview:

*Objective*
To assess the workability of freshly mixed concrete in its natural setting.

*Equipment*
- A slump cone (300mm high, 100mm diameter at the top, and 200mm diameter at the bottom)
- A tamping rod (600mm long, 16mm diameter)
- A level
- A stopwatch (optional)

*Procedure*
1. *Prepare the site*: Select a flat, level, and clean surface for the test.
2. *Fill the slump cone*: Fill the slump cone with freshly mixed concrete in three layers, each approximately 100mm high.
3. *Compact each layer*: Use the tamping rod to compact each layer, applying 25 strokes for each layer.
4. *Finish and level*: Strike off the excess concrete and level the surface.
5. *Lift the slump cone*: Carefully lift the slump cone vertically, allowing the concrete to slump.
6. *Measure the slump*: Measure the distance from the original height of the concrete to the height after slumping.
7. *Record the result*: Record the slump value, which indicates the workability of the concrete.

*Interpreting Results*
- *Slump value*: A higher slump value indicates a more workable and fluid concrete, while a lower slump value indicates a stiffer and less workable concrete.
- *Acceptance criteria*: The acceptable slump range varies depending on the specific application and project requirements.

*Advantages*
- Simple and quick to perform
- Provides immediate results
- Helps to ensure consistent concrete quality

*Limitations*
- May not accurately represent the concrete's behavior in all situations
- Requires proper technique and equipment to obtain accurate results

Road Survey: longitudinal and cross-sectional profiles.A road survey involves measuring and recording the dimensions and...
05/03/2025

Road Survey: longitudinal and cross-sectional profiles.

A road survey involves measuring and recording the dimensions and features of a road to create accurate longitudinal and cross-sectional profiles. Here's a breakdown of the process:

*Longitudinal Profile*
1. *Measurement*: Measure the distance along the road centerline using surveying equipment such as a theodolite, total station, or GPS.
2. *Elevation*: Record the elevation of the road surface at regular intervals using a level or GPS.
3. *Gradient*: Calculate the gradient of the road at each point using the elevation data.
4. *Profile*: Plot the longitudinal profile of the road, showing the elevation and gradient along the centerline.

*Cross-Sectional Profile*
1. *Measurement*: Measure the width of the road and the distance from the centerline to the edge of the road at regular intervals.
2. *Elevation*: Record the elevation of the road surface and the surrounding terrain at each point.
3. *Profile*: Plot the cross-sectional profile of the road, showing the elevation and width of the road and surrounding terrain.

*Data Analysis and Visualization*
1. *Software*: Use specialized software, such as Autodesk Civil 3D or Bentley MicroStation, to analyze and visualize the data.
2. *Profiles*: Create detailed longitudinal and cross-sectional profiles of the road.
3. *Maps*: Generate maps showing the road layout, gradient, and surrounding terrain.
4. *Reports*: Compile reports summarizing the survey findings and providing recommendations for road design, construction, or maintenance.

*Applications*
1. *Road Design*: Use the survey data to design new roads or upgrade existing ones.
2. *Construction*: Provide contractors with accurate data for road construction and maintenance.
3. *Maintenance*: Identify areas requiring maintenance, such as potholes or uneven surfaces.
4. *Traffic Management*: Analyze road geometry and traffic flow to optimize traffic management strategies.

A lecture on ROAD SAFETY and DISASTER MANAGEMENT by NGO.Effective Road Safety and Disaster Management require:1. *Intera...
20/02/2025

A lecture on ROAD SAFETY and DISASTER MANAGEMENT by NGO.

Effective Road Safety and Disaster Management require:

1. *Interagency Coordination*: Collaboration among government agencies, emergency services, and stakeholders.
2. *Public Awareness*: Educating the public on safety measures, emergency procedures, and disaster risk reduction.
3. *Infrastructure Development*: Investing in resilient infrastructure, including roads, bridges, and public buildings.
4. *Technology Integration*: Leveraging technology, such as emergency response systems, early warning systems, and data analytics.
5. *Community Engagement*: Fostering community involvement in disaster management and road safety initiatives.

Departmental Activity Site selection for helipadSite selection for a helipad involves evaluating potential locations bas...
19/02/2025

Departmental Activity
Site selection for helipad
Site selection for a helipad involves evaluating potential locations based on safety, accessibility, and environmental factors.

21/12/2024
20/12/2024

Address

Bhoranj (Tikker – Kharwarian), [H. P]
Hamirpur
176041

Telephone

+919816635709

Alerts

Be the first to know and let us send you an email when Department of Civil Engineering, CPUH posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The University

Send a message to Department of Civil Engineering, CPUH:

Share