20/08/2026
SITE VISIT & TECHNICAL ASSESSMENT
18 AUG 2026
A technical inspection and site assessment were recently conducted at the water dam area to evaluate structural integrity, review current safety measures, and map out accessible routes.
Key focus areas included technical aspects, safety, and route access. These efforts are vital to ensure structural safety and mitigate any risks that might occur in the future.