DADA Power Plants Academy I want to share knowledge about equipment's used in world biggest RLNG CCPP Power Plants and their

22/09/2024

I have involved in installation of power plants. But first time experiencing the dismantling process 210 MW steam turbin...
22/09/2024

I have involved in installation of power plants. But first time experiencing the dismantling process 210 MW steam turbine generator.

Lifting Gears training and inspection techniques training given by LEA expert Raheel Velosi       lifting_gears
13/01/2023

Lifting Gears training and inspection techniques training given by LEA expert Raheel Velosi
lifting_gears

03/01/2023

Removing the dead plugs of HP safety valves , inspecting the seat and stem and plug

01/01/2023

Bearing clearance is one of the most important parameters in the operation of a bearing. Therefore, it is important to determine the installed clearance along with the bore contour and concentricity to the outside fit diameter. The final bearing clearance is influenced by the contour of the housing into which it is installed, and also by the amount of interference or crush between the bearing shell and the support housing. Proper crush is crucial in the operation of high speed and critical machinery. Improper crush can lead to either a hot bearing or a loose bearing fit

20/12/2022

Checking Oil seals clearance at

18/12/2022

In my career I have seen and supervised many jobs but that was monster ,vertical motor and removal of it's thrust bearing ,Best Team work at the site
Even OEM dnt have much instruction, then experience came into play

Best Team ...specially foreman M Ilyas Khokhar ,hameed ,Azmat ,Sarmad aur Angraiz ,😜🤣 Amanat Miss you guys
18/12/2022

Best Team ...specially foreman M Ilyas Khokhar ,hameed ,Azmat ,Sarmad aur Angraiz ,😜🤣 Amanat
Miss you guys

Combined cycle mode    siemen control system
21/11/2022

Combined cycle mode
siemen control system

21/11/2022

T3000 is so advanced and user friendly ,at 1263 MW Jhang Plant whole BOP,GT and ST control system is the same .

Address

Lahore
54000

Telephone

+923018417669

Website

Alerts

Be the first to know and let us send you an email when DADA Power Plants Academy posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The University

Send a message to DADA Power Plants Academy:

Share