University of Michigan Medical School Facilities

University of Michigan Medical School Facilities Medical School Facilities acts as the representative for interaction with University service providers related to building operations.

We also coordinate and manage construction & renovation projects, security & access control, and special events.

NCRC Chemical Amnesty Day! Medical School Facilities, Environment, Health & Safety (EHS), and the Office of Campus Susta...
06/02/2025

NCRC Chemical Amnesty Day!

Medical School Facilities, Environment, Health & Safety (EHS), and the Office of Campus Sustainability (OCS) are hosting events that will allow laboratory occupants to clean up their spaces and dispose of chemicals.

Medical School Facilities, Environment, Health & Safety (EHS), and the Office of Campus Sustainability (OCS) are hosting events that will allow laboratory occupants to clean up their spaces and dispose of chemicals.

NCRC, Building 520: Supply Air ShutdownThe supply air in specific rooms of Building 520 will be shut down for preventati...
05/27/2025

NCRC, Building 520: Supply Air Shutdown

The supply air in specific rooms of Building 520 will be shut down for preventative maintenance beginning at 6:00AM on Saturday, June 7th through 2:30PM on Sunday, June 8th.

The supply air in specific rooms of Building 520 will be shut down for preventative maintenance beginning at 6:00AM on Saturday, June 7th through 2:30PM on Sunday, June 8th.

MSRB 1 & 2: Fire Alarm Tests Canceled The below fire alarm test has been canceled.A fire alarm test to verify successful...
05/27/2025

MSRB 1 & 2: Fire Alarm Tests Canceled

The below fire alarm test has been canceled.

A fire alarm test to verify successful operation of the fire alarm system will be conducted in the Medical Science Research Buildings 1 and 2 on Wednesday, May 28th.

A fire alarm test to verify successful operation of the fire alarm system will be conducted in the Medical Science Research Buildings 1 and 2 on Wednesday, May 28th from 6:30AM - 7:00AM, lasting approximately 15 minutes.

MSRB 1: Supply, Exhaust Air & Fume Hood ShutdownThe supply, exhaust system and fume hood fan will be shut down that serv...
05/27/2025

MSRB 1: Supply, Exhaust Air & Fume Hood Shutdown

The supply, exhaust system and fume hood fan will be shut down that serves labs and lab service rooms in the Medical Science Research Building 1 (MSRB 1) on Monday, June 2nd from 6:00AM - 10:00AM.

The supply, exhaust system and fume hood fan will be shut down that serves labs and lab service rooms in the Medical Science Research Building 1 (MSRB 1) on Monday, June 2nd from 6:00AM - 10:00AM.

Med Sci 2: Construction NoiseA project to demo a concrete floor in Medical Science 2 (Med Sci 2), Room 2710 has been res...
05/23/2025

Med Sci 2: Construction Noise

A project to demo a concrete floor in Medical Science 2 (Med Sci 2), Room 2710 has been rescheduled to begin at 6:00AM on Saturday, May 31st and last through 6:00AM on Sunday, June 1st.

A project to demo a concrete floor in Medical Science 2 (Med Sci 2), Room 2710 has been rescheduled to begin at 6:00AM on Saturday, May 31st and last through 6:00AM on Sunday, June 1st.

MSRB 1: Unscheduled Supply Air ShutdownDue to a component failure in the supply air system and current weather condition...
05/23/2025

MSRB 1: Unscheduled Supply Air Shutdown

Due to a component failure in the supply air system and current weather conditions, the ability to provide normal cooling conditions to specific rooms in Medical Science Research Building 1 (MSRB 1) is limited.

Due to a component failure in the supply air system and current weather conditions, the ability to provide normal cooling conditions to specific rooms in Medical Science Research Building 1 (MSRB 1) is limited.

Victor Vaughan: Door ClosureThe Victor Vaughan ground floor egress only door (near the elevator) will be closed beginnin...
05/21/2025

Victor Vaughan: Door Closure

The Victor Vaughan ground floor egress only door (near the elevator) will be closed beginning at 7:00AM on Wednesday, June 4th through 3:30PM on Friday, June 6th for exterior concrete repairs.

The Victor Vaughan ground floor egress only door (near the elevator) will be closed beginning at 7:00AM on Wednesday, June 4th through 3:30PM on Friday, June 6th for exterior concrete repairs.    During this time please use an alternative entrance/exit. The elevator will remain accessible.

Med Sci 2: Fire Alarm TestA fire alarm test to verify successful operation of the fire alarm system will be conducted in...
05/21/2025

Med Sci 2: Fire Alarm Test

A fire alarm test to verify successful operation of the fire alarm system will be conducted in the Medical Science 2 (Med Sci 2) building on Wednesday, May 28th from 6:00AM - 6:30AM, lasting 15 minutes.

A fire alarm test to verify successful operation of the fire alarm system will be conducted in the Medical Science 2 (Med Sci 2) building on Wednesday, May 28th from 6:00AM - 6:30AM, lasting 15 minutes.

MSRB 1 & 2: Fire Alarm TestsA fire alarm test to verify successful operation of the fire alarm system will be conducted ...
05/21/2025

MSRB 1 & 2: Fire Alarm Tests

A fire alarm test to verify successful operation of the fire alarm system will be conducted in the Medical Science Research Buildings 1 and 2 on Wednesday, May 28th from 6:30AM - 7:00AM, lasting approximately 15 minutes.

A fire alarm test to verify successful operation of the fire alarm system will be conducted in the Medical Science Research Buildings 1 and 2 on Wednesday, May 28th from 6:30AM - 7:00AM, lasting approximately 15 minutes.

BSRB: Supply Air ShutdownsThe supply air will be shut down that serves specific rooms of the Biomedical Science Research...
05/19/2025

BSRB: Supply Air Shutdowns

The supply air will be shut down that serves specific rooms of the Biomedical Science Research Building (BSRB) to make essential repairs to improve reliability according to the schedule below.

The supply air will be shut down that serves specific rooms of the Biomedical Science Research Building (BSRB) to make essential repairs to improve reliability according to the schedule below. 

Med Sci 1: Stairwell ClosureAs part of the continued renovations to Med Sci 1 - B/D Wings, stairwell  #8 will be complet...
05/19/2025

Med Sci 1: Stairwell Closure

As part of the continued renovations to Med Sci 1 - B/D Wings, stairwell #8 will be completely closed starting on Monday, June 9th. It is estimated the stairwell will reopen by the end of July 2025.

As part of the continued renovations to Med Sci 1 - B/D Wings, stairwell #8 will be completely closed starting on Monday, June 9th. It is estimated the stairwell will reopen by the end of July 2025. 

MSRB 2: Corridor PaintingThe Medical Science Research Building 2 (MSRB 2), 4th Floor corridor painting will begin on Tue...
05/19/2025

MSRB 2: Corridor Painting

The Medical Science Research Building 2 (MSRB 2), 4th Floor corridor painting will begin on Tuesday, May 27th and will last through July 2025.

The doors and frames will also be painted so there will be periods of time when...

The Medical Science Research Building 2 (MSRB 2), 4th Floor corridor painting will begin on Tuesday, May 27th and will last through July 2025.

Address

2800 Plymouth Road
Ann Arbor, MI
48109

Alerts

Be the first to know and let us send you an email when University of Michigan Medical School Facilities posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share