Perks Deconstruction

Perks Deconstruction Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Perks Deconstruction, 6800 A East 53rd Place, Commerce City, CO.

Every project starts with a team committed to doing the job the right way. From the first piece removed to the final cle...
08/20/2026

Every project starts with a team committed to doing the job the right way. From the first piece removed to the final cleanup, our team brings experience, care, and attention to every project.

Whole house deconstruction in Evergreen. Same standards as every Perks project site protected, materials salvaged, clean...
08/19/2026

Whole house deconstruction in Evergreen. Same standards as every Perks project site protected, materials salvaged, clean handoff. The mountain communities are part of our territory too.

Kitchen in, kitchen out. Every cabinet pulled clean, countertops removed intact, flooring up in sections. The GC had an ...
08/18/2026

Kitchen in, kitchen out. Every cabinet pulled clean, countertops removed intact, flooring up in sections. The GC had an open shell and zero surprises. That is a good day.

Commercial tenant improvement in the Denver metro. Our crew coordinates directly with the GC, works clean, and keeps the...
08/11/2026

Commercial tenant improvement in the Denver metro. Our crew coordinates directly with the GC, works clean, and keeps the surrounding space protected throughout. No babysitting required.

Floor protection goes down before anything else does. Hardwood, tile, carpet  it does not matter. If it is staying in th...
08/06/2026

Floor protection goes down before anything else does. Hardwood, tile, carpet it does not matter. If it is staying in the home, we protect it before the first tool comes out.

Late summer is when remodel schedules get serious. Contractors are booking fall projects and homeowners are ready to mov...
08/04/2026

Late summer is when remodel schedules get serious. Contractors are booking fall projects and homeowners are ready to move.

Original hardwood floors. Solid wood cabinetry. Vintage hardware. Pulled carefully so every piece stays intact and goes ...
07/16/2026

Original hardwood floors. Solid wood cabinetry. Vintage hardware. Pulled carefully so every piece stays intact and goes back into use. Nothing good ends up in a dumpster.

The crew does not show up and wing it. Every job has a plan, a sequence, and a standard. That is what keeps projects on ...
07/15/2026

The crew does not show up and wing it. Every job has a plan, a sequence, and a standard. That is what keeps projects on schedule and GCs out of damage-control mode.

Full residential deconstruction in Denver. Site was protected, salvageable materials were separated and pulled, and we h...
07/14/2026

Full residential deconstruction in Denver. Site was protected, salvageable materials were separated and pulled, and we handed it back clean and on schedule. That is the standard.

When we deconstructed this project, the majority of materials were diverted from the landfill. Lumber, fixtures, hardwar...
07/09/2026

When we deconstructed this project, the majority of materials were diverted from the landfill. Lumber, fixtures, hardware. All sorted, all documented, all going somewhere useful.

Address

6800 A East 53rd Place
Commerce City, CO
80022

Alerts

Be the first to know and let us send you an email when Perks Deconstruction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share